Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Costantino, N and Pietroforte, R (2004) Note - Production arrangements by US building and non-building contractors: an update. Construction Management and Economics, 22(03), 231-5.

Giritli, H and Oraz, G T (2004) Leadership styles: some evidence from the Turkish construction industry. Construction Management and Economics, 22(03), 253-62.

Goodrum, P M and Gangwar, M (2004) The relationship between changes in equipment technology and wages in the US construction industry. Construction Management and Economics, 22(03), 291-301.

  • Type: Journal Article
  • Keywords: Construction; labour; equipment technology; wages; computer
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/0144619032000116543
  • Abstract:

    The US construction industry has witnessed a drop in real wages since 1970. The decline in real wages may be attributed to a combination of socio-economic factors like migrant labourers, fringe benefits, safety procedures, union membership and worker skills. Another factor that may be impacting construction real wages is technological changes over the past couple of decades, including technological changes in construction equipment. This paper examines the relationship between changes in equipment technology and changes in construction wages with the help of five factors of equipment technology change: control, energy, ergonomics, functionality and information processing. Furthermore, data from the US Bureau of Labor Statistics’ Current Population Survey is used to examine the effects of computer usage on wages among US hourly workers in construction. The research findings show significant relations exist between changes in equipment control, functionality and information processing with wages among non-supervisory workers. Another finding indicated that although non-supervisory construction workers who use computers at work earn higher hourly wages, there was no added wage benefit after controlling for the effects of experience, education and age.

Leung, M-Y, Ng, S T and Cheung, S-O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(03), 319-31.

Low, S P and Hongbin, J (2004) Estimation of international construction performance: analysis at the country level. Construction Management and Economics, 22(03), 277-89.

Minami, K (2004) Whole life appraisal of the repair and improvement work costs of Post Office buildings in Japan. Construction Management and Economics, 22(03), 311-8.

Tang, S L, Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: model testing. Construction Management and Economics, 22(03), 263-75.

Wang, S Q, Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(03), 237-52.

Wild, A (2004) Re-interpreting the Building Industry Communications Research Project. Construction Management and Economics, 22(03), 303-10.